The phrase “hybrid structural steel frame” gets used fairly loosely in construction, and it means different things in different parts of the industry. Ask a residential builder, a shed manufacturer, a modular firm and a commercial engineer and you will get four different answers. They are all right, because hybrid framing is not one thing. It is a family of structural approaches that combine steel with another primary structural material, or that combine two kinds of steel framing within the same building.
This explainer takes the term apart. We walk through the three main families of hybrid structural steel frames in Australian construction, show which family each real project tends to belong to, and explain what the implications are for design, construction, and the standards your project is governed by. Along the way, we also clear up the related terms that get mixed in: primary and secondary framing, portal frames, light gauge steel, modular steel buildings, and the junction detailing that happens wherever two materials meet.
In one sentence. A hybrid structural steel frame is a building whose structural skeleton combines hot rolled structural steel with a second structural material in a deliberate, engineered way, so that each material does the job it is best at within the same building.
To talk about hybrid frames clearly, three terms need to sit in the right places. They get mixed up all the time, and the confusion is worth clearing up before going further.
Structural steel in its primary sense means hot rolled steel sections: universal beams (UB), universal columns (UC), parallel flange channels (PFC), rolled hollow sections (RHS, SHS, CHS), and plates. These are the heavy structural members that form the main load path of a building. They are rolled at hot temperatures in a steel mill, typically to AS/NZS 3679 for open sections and AS/NZS 1163 for hollow sections, and designed under AS 4100 Steel Structures.
Light gauge steel, also called cold formed steel or cold rolled steel, is a different product entirely. It is formed from thin steel sheet (typically 0.55mm to 1.6mm thick) rolled or press broken at room temperature into C sections, Z sections, hat sections and tracks. These are the sections used for residential wall studs, floor joists, roof trusses in low rise work, and secondary framing on larger buildings. They are designed under AS/NZS 4600 and, for residential and low rise work, system designed under the NASH Standard.
A hybrid frame combines two or more primary structural systems in one building. The three most common combinations in Australia are: hot rolled structural steel plus light gauge steel; structural steel plus concrete; and structural steel plus timber or cross laminated timber (CLT).
If you want a dedicated read on the light gauge side, our explainer on AS/NZS 4600 covers the design standard that governs the behaviour of the cold formed sections used in almost all hybrid Australian frames.
This is by far the most common hybrid in Australian construction, and it is probably the system people are picturing when they ask what a hybrid structural steel frame is. Hot rolled structural steel forms the primary structure (columns, beams, portal frames), and light gauge steel forms the secondary and infill framing (studs, joists, facade frames, roof trusses in shorter spans).
This family of hybrid is found on almost every medium sized industrial or commercial building in the country. An industrial shed will have hot rolled portal frames carrying the roof over a long clear span, with light gauge steel wall framing infilling between the portal columns, light gauge mezzanine floor framing, and in some cases light gauge roof trusses in secondary roof areas. A multi storey residential development will often have hot rolled structural steel columns and beams carrying the main structural load, with light gauge steel wall and floor framing inside the primary grid.
Each material does what it is best at. Hot rolled sections are strong, span long distances, carry heavy point loads, and form the stable primary skeleton of the building. Light gauge sections are light, easy to handle, precision manufactured for repetition, and well suited to the many small members that make up the walls, floors and secondary roof framing. Using hot rolled sections for the infill framing would be wasteful; using light gauge for the primary structure would exceed its practical span.
This is the family where the primary and secondary framing distinction is clearest. The primary framing system is the hot rolled columns and beams (or portal frames), which carries the building loads to the footings. The secondary framing system is the light gauge infill: the studs, joists, trusses and facade frames that sit within the primary grid and carry the finishes, cladding and live loads.
Primary vs secondary framing is a load path idea, not a material idea. The primary framing is whatever carries the building loads from the roof to the ground. The secondary framing is everything else that hangs off, infills between, or spans within the primary grid. In a hybrid building, the two systems commonly use different materials and different standards.
At CMC Steel Solutions, hybrid projects in this family are usually supplied as a package: the hot rolled structural steel columns, beams and portal frames, together with the light gauge steel wall, floor and secondary framing manufactured at our Craigieburn facility. Supplying both layers from one source removes a common set of coordination problems where the primary and secondary framing arrive with different connection detailing.
The services that cover this family of work are our industrial steel frame service for shed and warehouse projects, our commercial steel frame service for multi storey commercial and mixed use buildings, and our facade steel frame service for the secondary facade framing that sits on a primary structure.
The portal frame deserves its own section because it comes up so often in Australian industrial construction and is the most recognisable hybrid frame in the country.
A steel portal frame is a hot rolled structural steel frame made of two columns and a rafter beam (or two rafters meeting at the apex) rigidly connected so that the whole frame acts as a single structural unit. A row of portal frames spaced across the length of a building carries the roof over the clear interior span. This is the standard primary framing system for Australian sheds, warehouses, industrial buildings, workshops and agricultural buildings.
A portal frame building is a hybrid structure in the Family 1 sense: the portals themselves are hot rolled structural steel, but almost everything else (purlins, girts, mezzanine floor framing, infill wall panels, gable end infills) is light gauge steel or sometimes timber. The light gauge purlins and girts span between portal frames carrying the roof sheeting and wall cladding, which is work the primary portals are oversized for.
The practical detail of where timber meets steel on these buildings (gable end peak framing, door frames, treated timber in contact with steel) is covered in detail in our guide to wood and steel hybrid framing, which is a companion piece to this explainer focused on the construction junctions rather than the structural typology.
Portal frames are typically spaced at 6m, 7.5m, 9m or 12m centres along the length of the building, with the exact spacing driven by the purlin span capacity, the cladding system, and the wind loading. The clear span between columns commonly runs from 10m to 30m for a standard industrial shed, with longer spans available using trussed portals or heavier sections. Taller buildings and longer spans push the member sizes up and may introduce bracing systems to stabilise the primary frame against lateral loads.
The second main hybrid family is structural steel combined with concrete. This covers two related but distinct applications: composite floor systems and structural steel framed buildings with concrete cores or shear walls.
A composite floor consists of a profiled steel deck (sometimes called formwork decking or structural deck) spanning between hot rolled steel beams, with a concrete topping poured on top. The steel deck acts both as permanent formwork during the pour and as tensile reinforcement in the finished floor, working compositely with the concrete above through purpose made shear studs welded to the beams below. This is the standard floor system for medium to high rise commercial buildings in Australia.
In this variant, the primary vertical load carrying system is still hot rolled structural steel columns and beams, but lateral stability (resistance to wind and earthquake) is provided by a concrete core or concrete shear walls rather than by steel bracing. The concrete core typically houses the lift shafts, stairs and service risers, and provides most of the building stiffness. The steel structure is lighter and more efficient because it does not have to carry all the lateral load itself.
Both variants are standard in Australian commercial high rise construction, from CBD office towers down to mid rise suburban commercial. They also appear in large hospital buildings, educational facilities and transport infrastructure.
Composite floor systems combine the compressive strength of concrete (which is inexpensive and plentiful) with the tensile strength of steel (which is precise and spans well). Steel plus concrete core buildings use the concrete for stiffness and the steel for speed of erection, which lets the frame rise much faster than a fully concrete alternative.
The third and most recently growing hybrid family combines structural steel with engineered timber, most often cross laminated timber (CLT). This is an emerging category in Australian construction driven by low embodied carbon targets, prefabrication speed, and the aesthetic appeal of exposed timber.
In this hybrid, hot rolled structural steel columns and beams form the primary vertical and lateral load path, with CLT panels used as the floor and sometimes the wall systems. The CLT is both a structural element and a finished surface, which eliminates a layer of finishing work. The combination is becoming common on mid rise residential and commercial buildings, particularly in the educational and institutional sectors.
A lighter version of the same hybrid uses structural steel for the primary frame and traditional timber framing (as opposed to CLT) for the secondary wall or roof framing. This is common in some industrial and agricultural buildings where a steel portal frame is infilled with timber stud walls and a timber gable end.
The practical realities of timber meeting steel on these buildings (galvanic corrosion from treated timber, differential movement between materials, connector specifications) are covered in detail in our guide to wood and steel hybrid framing. The two blogs sit alongside each other: this one covers the structural typology, that one covers the construction detail.
The distinction between primary and secondary framing is one of the most useful ideas in structural design, and it is worth understanding independently of whether the project is hybrid or not.
Framing Type | What It Does | Typical Members |
|---|---|---|
Primary framing | Carries the vertical and lateral loads from the roof to the footings; defines the main structural grid | Hot rolled columns and beams, portal frames, trusses, shear walls or bracing systems |
Secondary framing | Infills between the primary frame, carries cladding and lining loads, transfers loads to the primary grid | Light gauge steel studs, joists, purlins, girts, facade subframes, timber infills |
A hybrid structural steel building has a primary framing system and a secondary framing system, and in most hybrid buildings those two systems use different materials. That is the easiest definition of a hybrid frame: a building where the primary and secondary framing systems deliberately use different materials, each chosen for what it does best.
Four forces are pushing hybrid framing from a specialist approach to a mainstream one in Australian construction.
Using the right material for each job is cheaper and lower carbon than overspecifying one material everywhere. A primary structure in hot rolled steel plus a secondary structure in light gauge steel is usually cheaper, lighter and lower in embodied carbon than the same building framed entirely in one material.
Both hot rolled and light gauge steel are manufactured off site to precise tolerances, delivered to site and assembled quickly. Hybrid frames are particularly well suited to prefabrication, because the primary frame can be stood first and the secondary framing panelised and dropped in behind it. This matches the growing shift to offsite construction documented in our analysis of the offsite shift in Australian construction.
The broader context on how prefabrication is reshaping Australian builds is covered in our articles on the offsite shift in Australian construction and Australia’s construction labour shortage and the role of prefabricated light gauge steel, both of which address why the industry is moving this way.
Steel is non combustible. For medium rise and high rise buildings where fire separation is critical, a steel primary frame gives a materially simpler path to meeting the Australian Building Code requirements than alternatives. The move toward higher density residential and mixed use in Australian cities is directly driving the growth of hybrid steel framed buildings.
Hybrid frames allow long clear spans (from the primary steel frame) with flexible internal partitions (from the light gauge or timber secondary frame). This supports the kind of open plan, adaptable floor plates that contemporary office, education and residential projects demand.
Portal frame plus light gauge, with timber or light gauge infills at gable ends. The oldest and most established hybrid system in the country, and still the dominant framing approach for Australian industrial buildings.
Hot rolled columns and beams with light gauge steel wall framing throughout the body of the building. Common in two to six storey apartment buildings, student accommodation, and social housing. Enables rapid erection without compromising the structural grid.
Our team recently completed the structural and light gauge steel framing for a 118 room student accommodation facade in Malvern East using exactly this kind of hybrid approach, documented on our facade steel frame page.
Hot rolled primary steel with composite concrete floors, chosen for the long clear spans and heavy point load capacity required by server equipment. These buildings are a growing category of Australian commercial construction and hybrid steel framing is almost universal.
Factory assembled modules combining a light gauge steel frame with hot rolled chassis sections, delivered as a complete 3D structural unit ready to stack on site. The modular segment is growing quickly in Australia, driven by housing pressure, and almost all modular units are hybrid structures.
Our modular building service covers how CMC Steel Solutions manufactures the primary and secondary framing for Australian modular construction clients, and how hybrid structural approaches are used in volumetric work.
Hybrid frames with timber or CLT secondary are becoming common in schools, universities and healthcare facilities where exposed timber is both a sustainability and a biophilic design goal. The primary structural steel provides the long spans and fire separation; the timber secondary provides the surface.
Hybrid frames are not harder to design than single material frames, but they do require more coordination. Four considerations come up on almost every hybrid project.
A hybrid frame typically has to comply with more than one design standard. A hot rolled plus light gauge building is designed under AS 4100 (for the structural steel) and the NASH Standard with AS/NZS 4600 (for the light gauge). A steel plus concrete composite is designed under AS 4100 plus AS 2327 Composite Steel Concrete Construction in Buildings. A steel plus timber hybrid picks up AS 1720 for the timber structural elements.
The highest risk of defects on a hybrid frame is at the connection between the two systems. Primary to secondary connections must transfer load reliably from the lighter system into the heavier one, and the tolerances of the two systems have to be compatible. Hot rolled sections have tolerances in the order of a few millimetres; light gauge sections have tolerances in the order of fractions of a millimetre. The interface detailing needs to absorb that.
Different materials move at different rates. Hot rolled steel expands with temperature. Concrete shrinks as it cures and creeps under sustained load. Timber swells and shrinks with humidity. Light gauge steel is dimensionally stable but is sensitive to thermal bridging. The connection detailing has to allow for the differential movement over the life of the building without transferring that movement into cladding or finishes.
Hybrid frames involve more than one trade, more than one supplier, and often more than one engineer certifying different parts of the structure. The clearer the shop drawings and the earlier the coordination, the smoother the build. This is why hybrid projects benefit disproportionately from a supplier who can provide both the primary and the secondary framing from a single source.
In a hybrid building, the light gauge secondary framing still follows the standard spacing rules covered in detail in our dedicated guides. External load bearing light gauge walls use 450mm centres with the same gauge decisions driven by wind zone. Floor joists use 300mm, 450mm or 600mm centres depending on span and load.
If you are working through the secondary framing specification on a hybrid project, the two guides to read alongside this one are our practical guide to stud spacing in Australian walls and our floor joist spacing guide for Australian builds. Those pieces cover the specific numbers; this one covers how the secondary framing sits within the primary structural grid.
Hybrid frames are usually cost competitive against single material alternatives, and often cheaper, because each material is used for what it does best rather than what it is adequate for. The exceptions are small buildings where the cost of coordinating two systems outweighs the material saving, and specialty buildings where a single material is specified for reasons other than cost (fire, acoustic, heritage).
For residential buildings, the cost of a hybrid steel frame typically tracks the cost of a light gauge only frame plus the primary steel members, which puts it roughly in the range covered in our guide to how much a steel frame house costs in Australia. For industrial and commercial buildings, the primary structural steel adds a larger line item but is offset by the simpler and faster secondary framing.
A hybrid structural steel frame is a building whose structural skeleton combines two or more materials in a deliberate way, with each material used for what it does best. The three most common hybrid families in Australia are hot rolled structural steel plus light gauge steel, structural steel plus concrete (composite floors or steel plus concrete core), and structural steel plus engineered timber (including CLT). All three are standard systems with established design standards in Australia.
A primary framing system is the structural skeleton that carries the vertical and lateral loads of a building from the roof down to the footings. In a steel building this is usually hot rolled columns and beams, portal frames, or load bearing structural steel walls. The primary framing system defines the main structural grid, and the secondary framing system infills within it.
Primary framing carries the main structural loads and defines the grid. Secondary framing infills within the grid, carries lining and cladding loads, and transfers those loads to the primary. In a hybrid steel building, primary framing is typically hot rolled structural steel, and secondary framing is typically light gauge cold formed steel (studs, joists, trusses, girts, purlins). The two systems use different design standards.
A portal frame is a rigid structural steel frame made of two columns and a rafter beam connected so that the whole frame acts as a single unit resisting both vertical and horizontal loads. Portal frames are the standard primary framing system for Australian sheds, warehouses, agricultural buildings and industrial facilities. A row of portal frames carries the roof over the clear span of the building, with light gauge purlins and girts spanning between them.
Light gauge steel framing is the family of cold formed thin walled steel sections (studs, joists, tracks, trusses) used to frame residential, low rise commercial and secondary framing of larger buildings. The sections are rolled from steel sheet typically 0.55mm to 1.6mm thick before coating, designed under AS/NZS 4600 and, for residential and low rise use, system designed under the NASH Standard. It is the most common framing system in Australian residential construction and the most common secondary framing system in hybrid buildings.
A modular building is a structure that is manufactured off site as 3D volumetric modules and assembled on site. In the Australian context, almost all modular buildings use a hybrid structural steel frame combining a hot rolled or heavy gauge steel chassis with a light gauge steel internal framing system. Modular construction is growing quickly in Australia because of housing pressure and the speed and quality advantages of factory assembly.
Australian modular firms most commonly work with a hybrid structural steel system combining heavy steel chassis sections with light gauge cold formed steel framing. A smaller number of modular firms use CLT (cross laminated timber) for the primary structure, sometimes in combination with steel. Pure concrete modular systems also exist but are less common at the mid rise scale.
The most common steel framing technique in Australian low rise construction is light gauge cold formed steel framing, manufactured to the NASH Standard and typically from TRUECORE steel. For larger buildings, hybrid structural systems combining hot rolled primary steel with light gauge secondary framing dominate the industrial, warehouse and mid rise residential segments. Fully welded structural steel frames remain standard in heavy industrial and mid to high rise commercial construction.
If you are planning a residential, commercial or industrial build and want practical numbers, drawings or product advice to work from, the CMC Steel Solutions team is a direct call away. Phone us on 1300 285 566, email info@cmcsteelsolutions.com.au, or request an obligation free quote and we will walk through your project, the standards that apply, and what the right steel framing solution looks like for your specific site.